Modine horizontal concentric vent kit installation instructions. diameter pipe systems (See Figures 3, 4, 5, and 6 for the different applications. All termination kits must be located and installed in accordance with the installation instructions found in this guide and with the local building code and NFPA 54 / ANSI Z223. Install air intake piping and vent into vent plate openings. Z-Flex 2SVSNA04. For models HDS60 - HDS125 only. 320 PINEBUSH RD, UNIT 10. This kit contains: 94 degree elbow, Horizontal Termination, Trim Plates, Hardware, and Installation Instructions. 4m), the concentric vent kit cannot be used. 00, you save 5%. diameter pipe systems, (See Figures 3, 4, 5, and 6 for the different applications. 99/month. Determine correct concentric vent termination accessory for the pipe diameter selected. - Alternative part number 3H034929005. Vent should extend no Modine Unit Heater Horizontal Concentric Vent Kit. Aug 15, 2022 · The Universal Concentric Vent Kit (UCVKTM) is a versatile device allowing for compact space saving installations of tankless water heaters. PTC heater pdf manual download. Our commercial-grade power vent unit heaters come with either a propeller fan or centrifugal blower fan in seven different sizes. Concentric Vent Kit Types CVK-3 30 to 45 MBH CVK-4 60 to 125 MBH CVK-6 150 to 250 MBH follow these instructions can result in injury or death. Do not install this box on the exterior of a building or structure. The Concentric Vent allows both the intake for combustion air and the exhaust vent to pass through a standard roof or sidewall. (1) 4" x 1. 00-98-397 wht concentric vent kits summeraire 8. - Heavy duty metal concentric adapter box includes flanges for quick mounting to interior. The GVS-65 Concentric Vent Termination Kit must be installed according to the appliance manufacturers installation instructions, this installation guide and the NAPCO GVS-65 Installation Guide. In most applications, kit contains the components you need all in one box to vent a 4" tankless water heater. - Kit includes a concentric vent kit adapter box for arranging the tubing properly, as well as both vent and combustion air pipe terminals an termination guards. Compatible with Sterling, Modine, Dayton, Mr. All field gas piping must be pressure/leak tested prior to operation. 1. STEP 2: Assemble the Vent Pipe Assembly by cleaning and cementing the rain cap to the smaller diameter PVC pipe (see Figure 2). Follow the furnace installation instructions for locating the furnace, clearances, operation and safety procedures. Includes. Stainless steel venting kits for gas unit heaters. Was $342. Modine garage heaters offer a solution for your Page 2 2 | Concentric Horizontal Vent Kit Installation Manual Data subject to change Bosch Thermotechnology Corp. Modine - 32162 - Horizontal Concentric Vent Kit - Non-Condensing Unit Heaters - For Modine PTS250, PTS300, PTS350, PTS400, BTS250, BTS300, BTS350, And BTS400 Unit Heaters. Compare. The application flexibility of Modine’s separated-combustion unit heaters are greatly enhanced when coupled with concentric-vent kits. 1 (NFPA 54) - latest edition. Install rain cap and small diameter pipe assembly in Y concentric fitting and large pipe assembly. The 3-inch wall thimble is used for many single wall pipe, horizontal vent exhaust applications. Exhaust flue pipe and fittings are Category 3 UL1738 rated. b) Cement 4” x 6” (10 cm x 15 cm) bushings to Y fitting, see Figure . Buy Mr. (2. Clearances to combustibles as specified above must be strictly maintained. Follow furnace installation instructions for cleaning and cementing. 3_concentric_vent_kitConcentric vent kit noritz Modine horizontal concentric vent kit 32161Vent concentric wht. It has reduced chances to intake contaminants and has less visible vent vapors. New (2) from$31700 & FREE Shipping. 86 / ea. When horizontal vents pass through a combustible wall (up to 22 inches thick), the vent passage must be constructed Components and insulated as shown in Figure 9. NEXT. Additional InformationConcentric Vent Kit (PDF) installed with the Horizontal Vent. Cut a 4" diameter hole for 1CT0302, 2" kit, or a 5" hole for 1CT0303, 3" kit. Under no circumstances should two sections of double wall vent pipe be joined together within one horizontal vent system due to the inability to verify complete seal of inner pipes. NOT suitable for HD models. Description: Modine 32161 / 3H34930-3: - Horizontal Concentric Adapter Kit. Concentric horizontal and vertical vent/ combustion air systems are the only venting/combustion air systems approved for Model SDH. Unit Suspension Be sure the means of suspension is adequate to support the weight of the unit. STEP 1: Cut a 4" (-E02, -E02A) or 5" (-E02, -E03A) diameter opening in the roof and install field-supplied weather-seal boot/flashing for the PVC air intake pipe. a. Sep 6, 2021 · Modine 32162 - Horizontal Concentric Vent Kit- Horizontal Concentric Vent Kit. In Canada installation must be in accordance with CSA-B149. Nov 13, 2023 · Vent concentric kit sterling gg venting heat heater exhaust intake gas diagram horizontal vertical shown hole below combustion separated onlyI installed a concentric vent and just wanna know if i installed it Modine concentric vent kit installation instructionsSterling gg gas heater concentric vent kits for separated combustion as-x7. . Cambridge, Ontario, Canada N1T 1Z6. View and Download Modine Manufacturing PTC installation and service manual online. Products Includes: Consult your furnace installation instructions for the allow-able length and size of the plastic vent pipe. Free shipping on orders over $99 Your Zip: 23917 14. 1 Notes On Installation 3. Free Shipping on items over $199. 1. View Document. - Allows 1 hole in roof when venting 2 pipe Modine separated combustion unit heaters. $55. 75 inch round fresh air inlet collar 14. Page 9 InsTAllATIon - venTIng figure 9. Ensure small diameter pipe is bottomed and cemented in Y concentric fitting. Complies with US standard (UL1738) and Canadian standard (S636). These kits utilize single-wall penetration for venting purposes, reducing installation and maintenance costs. (See Fig. Certified for residential, commercial, and industrial use. Greenhouse Vent Kit includes: Modine HD 3 Modine 32161 - Horizontal Concentric Vent Kit, 32161- 32161 is an official OEM Horizontal Concentric Vent Kit for Modine HVAC equipment. Vent Kit, inspect all parts Contact. NOTE: Read the entire appliance installation manual and these instructions BEFORE starting installation. 5. Originally $292. cv6wVent concentric kit sterling gg venting heat heater exhaust intake gas diagram horizontal vertical shown hole below combustion separated Description. Write A Review. Note: A roof termination is less susceptible to damage. This section applies to both horizontally and vertically The concentric vent adapter box must be installed inside of vented concentric vent systems as defined in “Section A the structure or building. Find and download user guides and product manuals. Asurion Complete Protect: One plan covers all eligible past and future purchases (Renews Monthly Until Cancelled) for $16. Model: 32162. Modine 77793 / 3H34929-5: - Vertical Concentric Adapter Kit. - Alternative part number: 3H034930003. A. 40. Cut a 6” diameter hole for CVENT-4, 4” kit. 3 Elbow and Wall Termination 3. 397116 ipex 3" x 44" pvc 1738 149f max concentric flue gas vent kit. Vent kit is for 2, 2-1/2 or 3 in. Free shipping on orders over $99 Your Zip: 23917 This is a vertical concentric venting kit designed for use with Modine gas fired unit heaters. Improper installation, adjustment, service, or maintenance can cause property damage, injury, or death. Material: Category III stainless steel. For use with Modine Hot Dawg HDS Heaters, HDS60, HDS75, HDS100 and HDS125, QC Part #20840. Concentric Vent Kit Adapter Box. This 3-inch wall thimble is a rigid pipe, using Category III Stainless Steel. This will prevent a recirculation of ue gas. Refer to the Owner’s Use and Care Manual provided with your Direct Vent Tankless Water Heater for additional installation considerations and directions. Please Note: This kit ONLY works with the 30,000, and 45,000 BTU HDS heaters. Includes: (1) Termination Hood. The Concentric Vent Termination Kit is shipped as-sembled but not cemented. Page 3: Table Of Contents 1. The concentric vent kit cannot be modified to attach a tee or elbow to the vent portion of the rain cap. 7:00am – 5:00pm. General Information. Concentric vent kits include: Concentric vent box; Inlet air screen; Deflector disc; Vent cap; Silicone o-ring gaskets (3) High-temp silicone (Model X7-4) The 4 Modine 77793 - 4" Vertical Concentric Vent Kit, 77793- 77793 is an official OEM 4" Vertical Concentric Vent Kit for Modine HVAC equipment. Installation must conform with local building codes or in the absence of local codes, the National Fuel Gas Code, ANSI Z223. ROOF INSTALLATION. Follow venting and clearance instructions furnished with the heater and the b vent and you should be fine. Also Available: Modine Hot Dawg Horizontal Concentric Vent Kit - HDS30 and HDS45, QC Part #20845. This allows for a snug-to-ceiling installation that meets the 1” clearance to combustibles from the top of the unit. For those with a hot water boiler, a hydronic model – the Hot Dawg ® H20 – is also available. All, IODIN by in the process of installing a Modine HDS 75 and must a pose concerning aforementioned air vent. Description: Modine 77792 / 3H34930-5: - Horizontal Concentric Adapter Kit. 2): Cement the rain cap to the smaller diameter kit pipe. Garages and workshops, light commercial or industrial heating solution. 83% thermal efficiency, maximizing seasonal efficiency through the use of a collector box and the power exhauster. When horizontal vents pass through a combustible wall (up to 22" thick), the vent passage must be constructed and insulated as shown in Figure 9. Also for: Btc, Ptc55, Ptc65, Ptc85, Ptc110, Ptc135, Ptc156, Ptc180, Ptc215, Ptc260, Ptc310, 1 — Wye concentric Fitting Only one vent kit per each furnace or boiler is allowed. No. The category 3-horizontal 4 in vent kit provides class 3-single wall ducting for use with Mr. Click for important monthly payment and offer information. Installation must conform with local building codes or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223. Do not install this box on the This is a horizontal concentric venting kit designed for use with Modine gas fired unit heaters. - Allows 1 hole in sidewall when venting 2 pipe Modine separated combustion unit heaters. $38. Draws combustion air from outside the workspace, ensuring the unit always has plenty of fresh, clean air to breathe. All models can run on propane or natural gas, depending on your needs. Free shipping on orders over $99 Consult your furnace installation instructions for the allow-able length and size of the plastic vent pipe. Heater Big Maxx unit heaters, ranging from 50,000, 80,000, and 125,000 BTUs. Unit Heaters. C8. Modine Vent Kit Horizontal Concentric 4 Inch. Vent Cap/Termination. CLOSED. 2m) and 8 ft. With the thimble you will be fine. Duravent 4GV36 Pipe B Vent Round Rigid 4 x 36 Inch Aluminum/Galvanized. 11HU300A1NS1110A. These instructions cover installation of the 2” and 3” concentric vent termination kit ONLY. 2 Appliance Adapter 3. The concentric vent adapter box must be installed inside of the structure or building. 4. The 3-inch wall thimble is adjustable from 4" to 7" and has dimensions of 8" x 8". 16. This kit contains: Two Pipe to Concentric Appliance Adapter, 94 ۫degree elbow, Horizontal Termination, Trim Plate, Hardware, and Installation Instructions. The eve 15" above the outlet may be too close. The concentric vent kit allows the air intake and exhaust to vent to the outside wall with only one hole as shown in the picture below. vertical concentric termination vent kit stainlessConcentric kits Modine concentric vent kit installation instructionsConcentric vent cvent. $47. Garage/Shop Vent Kit includes: Modine HD 3" adapter, two 12" x 3" vent pipes, 3" wall thimble with adjustable vent pipe, 3" screened termintation tee, and installation instructions for HD heaters. Outlet Vent Termination Cap Combustion Air Aug 17, 2022 · System1738 Pipe, Fittings, Termination Kits and Cements are certified as a system and must be installed as such. –. The vent must be supported as shown in Figure 9. - Alternative part number 3H034930005. See page 5 for combustion air piping instructions. Reduce installation and maintenance costs for your Modine Hot Dawg HDS Unit Heater with this Horizontal Concentric Vent Kit. intake/vent systems. 8. com. Noritz CVK-H-F - Standard Concentric Horizontal Vent Kit- Standard Concentric Horizontal Vent Kit. Keep the fiberglass insulation away fro the B vent. Determine the best location for the intake/vent. (1) Combustion Air Pipe Terminal. • Standard Gary Steel 1092 vent termination • Specially designed inlet terminal (part #5H75154B1) For Horizontally V ented Units (Refer to Figure 3. Vent Termination Cap. Determine correct HVENT kit size for the pipe diameter selected. Oct 14, 2015 · This is a horizontal concentric venting kit designed for use with Modine gas fired unit heaters. PTC/BTC Series high efficiency, separated combustion gas-fired unit heaters. Free shipping on orders over $99 Jul 4, 2023 · Vent concentric terminal furnace kit royal2" concentric vent kit Vent bth concentric termination 15cm installation instructionsConcentric vent terminal 2". com FREE DELIVERY possible on eligible purchases NAPCO GVS-65 Concentric Vent Termination Kits are certified to ULC S636, for use with the GVS-65 Gas Venting System. The concentric vent adapter box must be installed inside of the structure or building. (See page 19 for unit weights. Compare Modine models, prices, and specs to find the perfect Modine Unit Heater Vent Kit for your application. 2. 75 inch round fresh air inlet collar This handy kit meets the needs of your heater with less structural alterations to your garage, shop or warehouse. Field supplied pipe and fittings are required to complete Modine 57913 - PTC Horizontal Concentric Vent Kit, 57913- 57913 is an official OEM PTC Horizontal Concentric Vent Kit for Modine HVAC equipment. b. - Heavy duty metal concentric adapter box includes flanges for quick mounting to sidewall interior. Never use an open flame. The pipe length of the concentric vent kit can be shortened; providing that the cutting and cementing procedures adhere to the IPEX Flue Gas Venting Systems (FGV) guidelines. ) Both the combustion air and vent pipes must attach to the vent kit. 1 Key To Symbols 1. This installation method can be used for non-direct vent termination as well. This is an alternative to the standard two pipe intake/vent shown in the basic furnace installation instructions. These kits utilize single-wall penetration for venting purposes, reducing installation and maintenance costs. Our Price: $277. $324. Operating at up to 97% thermal efficiency, Modine’s Effinity ™ condensing unit heater features the highest efficiency available in North America for commercial and industrial gas-fired unit heaters, which will dramatically lower energy costs and CO2 emissions. This is a vertical concentric venting kit designed for use with Modine gas fired unit heaters. Check Details. 2 - vertical Concentric vent Kit C7. 4 days ago · View Details. This is a high quality kit. About This Product. Size: 3-inch diameter, adjustable from 4" to 7 7. x 5 in. 14. Modine 57918 - PTC Horizontal Concentric Vent Kit, 57918- 57918 is an official OEM PTC Horizontal Concentric Vent Kit for Modine HVAC equipment. Add lists straight to your cart. 00. Modine Horizontal Concentric Vent Kit. 79 / ea. Sale Price Ends Tomorrow! $47 / Month. Installation must conform with local building codes or in the Code, ANSI Z223. Horizontal Vent Terminal (using option CC6 kit) Vertical Vent Terminal (using option CC2 kit) Single-wall vent pipe approved to UL Std 1738 for a Category III appliance is required. Inlet Terminal. 2 - Vertical Concentric Vent Kit Components C7. 5 Appliance Adapter Nortec Universal 4" Stainless Steel. Jun 20, 2023 · How to: horizontal concentric vent installationHome repair adventures: concentric vent Vent bth concentric termination 15cm installation instructionsConcentric vent modine manualzz venting. Cut a hole (4” diameter for 2” concentric vent) or 5” diameter for 3” concentric vent kit). It should tell you in the venting instructions. Contact Noritz America at 866-766-7489 for additional information should additional pipe length need to be added to the termination. On Sale Ends 05/31. Save products you frequently purchase together. This industry-leading efficiency is a result of the coupling of our secondary heat exchanger technology with our robust tubular The application flexibility of the HDS separated combustion unit heaters are greatly enhanced when coupled with our concentric-vent kits. Read these instructions completely before attempting installation. Page 10 InsTAllATIon - venTIng section d – Concentric vent system cAUTION Installation D1. Made of durable stainless steel, the kit includes the components required to construct a typical through-the-wall venting with horizontal termination. Oct 10, 2012 · HOW TO: HORIZONTAL CONCENTRIC VENT INSTALLATION: STEP-BY-STEP This video shows typical steps during installation of horizontal concentric vent kit. Use for horizontal or vertical venting. The 22153 Concentric Vent kit is for use with 3 in. 75 inch round fresh air inlet collar sized to accept 4 Owner’s Use and Care Manual provided with your Direct Vent Tankless Water Heater for additional installation considerations and directions. The concen-tric vent termination assembly is equal to 4 feet of 3" inlet and outlet pipe, or 3 feet of 2" inlet and outlet pipe. Displaying Products 1 - 19 (of 19 Products) Shop Modine Unit Heater Vent Kits at ACWholesalers today & save. Partially assemble Concentric Vent kit. Clean and cement using procedures explained in the furnace Do not mix & match parts from different mfg. - For HDS30 and HDS45 (30,000, and 45,000 BTU HDS heaters). A tee or elbow attached to the rain cap could potentially direct the flue gas plume toward the intake air stream and contaminate the incoming combustion air for the furnace. System 636 pvc fgv concentric vent kitVent concentric wht Ubbink concentric vent condensing non componentsHow to install venting for high-efficiency equipment. 2 Safety Instructions 2 Scope Of Delivery 3 Installation 3. 4-Year Protection for $52. I nstall vent pipe and combustion air pipe between unit heater and concentric vent adapter box as outlined in "Section A – General Instructions – All Units". It seamlessly transitions from vertical collars on the heater to a horizontal concentric vent for sidewall termination. 3. CVK-3”, 4”, or 6” Concentric Vent Kit Installation Instructions WARNING The following installation MUST be performed by a qualified service person. Modine’s Hot Dawg ® heater keeps the chill out of your residential garage, workspace, or outbuilding. Order the Modine 32162 Horizontal Concentric Adapter Kit at NorthStock. The piping fitis excellent and goes together effortlessly. FIG-1. (1) Concentric Vent Kit Adapter Box. 1) Install Y concentric fitting and pipe assembly through the wall structure’s hole. Modine offers a horizontal-venting kit as standard equipment with each separated-combustion unit heater. This Stainless Steel 3 in. The water coils are warranted for operation at water pressures up to 150 psi and temperatures up to This is a horizontal concentric venting kit designed for use with Modine gas fired condensing unit heaters. intake is 4” or less or greater than 24”. a) Cement Y concentric fitting to larger diameter kit pipe, see Figure . 1 - exhaust vent Construction Through for Horizontally vented units (refer to figure . 90. The piping fit the 3" exhaust of the Modine perfectly. Find wholesale prices on top Modine Unit Space Heater Vent Kits. The bushing without the stop-lip must be installed at the straight end of the “Y” to install the 4” ( 0 cm) vent pipe. Installation and service instructions in this manual are applicable to model HHD, low profile hot water unit heaters, which should be installed in their proper applications for their most effective function as heating units. The horizontal section of pipe in the vent terminal that extends through the box and runs concentric through the combustion air pipe must be one-piece with no joints. Partially assemble concentric vent termination kit. Heater, Heatstar, Big Maxx, and most other unit The Hot Dawg includes angled hanging brackets designed for 3/8” bolts, lag screws, or rods. Do not install this box on the Manuals Brands Modine Manuals Heating Horizontal Concentric Vent Kit - 4" Vent are General Instructions for Double W all (T ype B) T erminal Pipe Installation: 3. Venting instructions for indoor power vent units** Standard power vent installation (each heater has its own dedicated vent) Venting instructions Common vent installation with option AV6 for indoor fan assist units** (unit sizes 030, 045, 060, 075 and 100 only) Venting instructions Separated-combustion installation with field-installed option Nov 6, 2023 · Sterling GG Gas Heater Concentric Vent Kits for Separated Combustion AS-X7. ROOF TERMINATION. A power exhaust can rotate 180° allowing the unit to be vented vertically or horizontally. The kit includes a concentric vent kit adapter box for arranging the tubing properly, as well as both vent and combustion air pipe terminals. Enlarge Image. Assemble the Intake Pipe Assembly by Description: Modine 57913 Horizontal Concentric Adapter Kit Features: - Use with Modine gas fired condensing unit heaters. 1 National Fuel Gas Code. Units can also be suspended with threaded rods and Modine vibration isolation kits if lower vibration and noise levels are essential. 3): Combustible Walls and support Bracket Concentric adapter assembly (same for horizontal and vertical kits) FIBER GLASS METAL INSULATION Special vent termination cap (part #5H75150B1) SLEEVE MIN. The concentric vent termination assembly is equal to 4 feet of 3" inlet and outlet pipe, or 3 feet of 2" inlet and outlet pipe. Use furnace installation instructions to determine pipe diameter. Concentric Direct Vent Termination Kit is designed for use with Rheem EcoSense Mid Efficiency Tankless gas indoor direct vent Units. bustion Horizontal Vent Kit to the tankless water heater. PurePro D110 Thermostat Digital Non-Programmable 1 Heat 45 to 90 Degrees Fahrenheit. Low prices and free shipping on all Modine units, parts and accessories. Modine 77792 - 4" Horizontal Concentric Vent Kit, 77792- 77792 is an official OEM 4" Horizontal Concentric Vent Kit for Modine HVAC equipment. ) For proper operation, the unit must be installed in a level horizontal position. How to: horizontal concentric vent installation. 58 / ea. 1 — 3" Y concentric Fitting Only One Vent Kit per each Furnace Allowed. Install multiple Concentric Vents where the horizontal distance between the ends of each air. The vent kit must terminate outside of the structure and Apr 9, 2024 · NEXUS PVC Concentric Vent Kit, For Use With Mfr. - 3. These instructions cover how to use the above kits to install two of any combination of the following 150 to 250 models or 300 to 500 models of water heaters in a common horizontal direct vent configuration. The unique concentric adapter assembly required with this heater allows for both combustion air and exhaust piping with only one horizontal or vertical penetration hole in the building. This is a horizontal concentric venting kit designed for use with Modine gas fired unit heaters. Free shipping on orders over $99 Your Zip: 23917 Description: Modine 33356 Vertical Concentric Adapter Kit 3H34929-3: - Alternative part number: 3H034929003. Designed for horizontally vented heaters mounted to an outside wall. . Model: 32161 Item Number: 48410. Dec 16, 2014 · Watch as one of Modine's service tech's discusses how to vent a Modine unit heater horizontal category III in the commercial & industrial industry. Back-flow preventer is included for cold climates. Suggested monthly payments with 6 month financing. EGO am venting horizontally with the concentric vent repair and have been going back additionally forth on whether I should how B Aeration or single wall pipe. Please refer to manufacturer's THE INSTALLATION AND MAINTENANCE INSTRUCTIONS IN THIS vent pipe be joined together within one horizontal vent system The concentric vent adapter box must be Attach the combustion air intake and vent pipe terminations as follows: D13. Page 9 INSTALLATION - VENTING Figure 9. (1. 99. Page 9 InsTAllATIon - venTIng figure . The vent kit must terminate outside of the structure and Modine 33357 - 6" Vertical Concentric Vent Kit, 33357- 33357 is an official OEM 6" Vertical Concentric Vent Kit for Modine HVAC equipment. (1) Vent Pipe Terminal. Question? Call or text 888-757-4774. (1) 4" x 90 Elbow. Use these instructions for installation of the concentric vent termination kit. Product Includes. Heater 4 inch Stainless Steel Horizontal Vent Kit for Big Maxx MHU50 and MHU80 Unit Heaters, One Size, Metal: Heaters & Accessories - Amazon. 5' pipe (1) 4" x 1' pipe. D14. Rheem 3 in. Most durable, longest lasting, and lowest maintenance vent system available for Modine Hot Dawg heaters. (1) Vent Terminal Cap. Create unlimited lists. Modine’s Hot Dawg ® is available in 6 model sizes, ranging from 30,000 – 125,000 BTUs. 4 Redirecting The Vent Discharge 4 Spare Parts Jun 24, 2020 · 3-Year Protection for $39. For 60,000, 70,000, 100,000, and 45,000 BTU HDS heaters, you need QC Part #20842. Unpack the Horizontal . Partially assemble concentric vent RAIN CAP. the best location for the termination kit. 15. The kit includes a concentric vent kit adapter box for arranging the tubing properly, as well as both vent and combustion air pipe terminals an termination guards. xw vk oi rd ct se gc xa nu aq